Contact information

Get in touch

Contact us today, and let’s work together to find solutions.

Invalid name
Invalid last name
Invalid email address
Incorrect email address
Submit

Thank you!

We will contact you shortly to provide further assistance and answer any questions you may have.

Oops! Something went wrong while submitting the form.
/
Zero rejections. Zero manual work. Zero compliance headaches.

NERC GADS Reporting Without All The Manual Work

Fully automated event and performance creation for Solar, Wind, Fossil, Hydro, and more to reduce errors and save hundreds of hours per year. NERC GADS automation platform connects to your existing PI/SCADA systems and handles everything automatically—from event creation to final submission.

Schedule a Demo

All the tools you need to simplify GADS management.

/
What we provide
Automated Event and Performance Creation
Direct PI/SCADA Integration
Auto-generated Reports
Out of the box connections to obtain ISO/RTO outages
Out-of-the-box Performance Dashboards
Metrics and KPI Forecasting

Why PowerGADS is the #1 NERC GADS Solution.

/
Reliability
/01

Fully Automated Solar GADS Automation

Solar GADS Automation requires weather normalization and irradiance correlation that manual processes can't handle accurately. The system distinguishes between actual equipment failures and weather-related derates.

  • Weather-normalized availability calculations
  • Equipment failure vs weather derate classification
  • Inverter fault detection and categorization
  • Wind resource correlation with unit performance
/01

200+ NERC GADS Data Validations and Error Checks

NERC rejects submissions when data relationships don't make logical sense. Our NERC GADS Automation Software catches the same errors NERC auditors look for before you submit.

  • Outage hours don't exceed total hours available
  • Performance factors stay within unit design limits
  • Outage start times occur before end times
  • Maintenance schedules align with actual events

/01

Automatic NERC Standards Updates

NERC changes reporting requirements throughout the year with short notice periods. The NERC Automation Platform updates calculation methods and event codes automatically when standards change.

  • New calculation method implementation
  • Updated event classification rules
  • Revised reporting deadlines
  • Changed performance metric definitions

/01

99% Automated Wind GADS Automation

Wind GADS Automation handles complex operating patterns that create different types of GADS events. The system uses plant control signals to classify events correctly.

  • urbine-level outage classification
  • Weather vs equipment failure separation
  • Wake effect impact analysis
  • Individual turbine performance tracking

/01

Comprehensive Self-Service Reporting

NERC requires specific performance metrics calculated using exact formulas. NERC GADS Reporting Automation generates all required reports with correct calculations built in.

  • Complete NERC reliability metrics
  • Unit availability trending analysis
  • Performance factor calculations by technology
  • Maintenance planning and outage summaries

/
Testimonials

PowerGADS has saved our team hundreds of hours per month. Instead of entering the same data 3-4 times across systems and manually checking event date, now our plant supervisors enter the data once.

Cooperative in the Southwest US

Cooperative in the Southwest US

Sr. Business Analyst

The implementation process was seamless, thanks to their well-structured approach and clear communication. The Integ team has demonstrated a deep understanding of NERC requirements and constantly evolving NERC/ISO GADS guidelines.

Pratish Kumar

Pratish Kumar

Director | Operations Reporting | Commercial Analytics

How PowerGADS Simplifies and Automates GADS

/
No wrangling plant managers. No manual data entry. No complicated plant setup. The worst part of your job just get a whole lot easier.
1
Easy Connection To PI/SCADA

Easy Connection To PI/SCADA

Our native API easily connects to 99% of PI/SCADA systems. No complicated setup.

2
Done-For-You Plant Setup

Done-For-You Plant Setup

Have 1 or multiple plants? We handle the setup completely for you in just days.

3
Start Automation in 2 Weeks

Start Automation in 2 Weeks

Our out-of-the-box automations cover most scenarios with done-for-you solution building covering the rest.

Drag

Frequently Asked Questions - Outage Management Software

No items found.
/
See it in Action

Claim Your 300+ Hours Back with Full NERC GADS Automation

Schedule a Demo
Process Acceleration