PRC-028, PRC-029 & PRC-030 Automated End-to-End
Integ's PowerCompliance handles every data collection, reporting, and performance analysis requirement across all three NERC IBR standards — so your team stays compliant without building a new manual process.

Trusted by leading generation owners and operators


Three New Standards. One Narrow Compliance Window.
PRC-028, PRC-029, and PRC-030 impose strict new data capture, ride-through verification, and performance analysis requirements on every IBR asset you own. Meeting them manually — across distributed solar, wind, and storage fleets — is not a sustainable path.
High-volume disturbance data
PRC-028 requires synchronized SER, fault recording, and dynamic disturbance data from every IBR site — time-stamped to UTC and ready for NERC review.
Real-time performance thresholds
PRC-030 mandates detection of unexpected real power changes ≥20 MW within 4 seconds. Missing an event isn't a data gap — it's a potential violation.
Overlapping, phased deadlines
Each standard carries its own compliance timeline. PRC-028 partial compliance was due April 2025. PRC-030 full compliance hits October 2026. Manual tracking invites missed milestones.
Cross-standard audit exposure
NERC auditors validate consistency across standards. Siloed evidence management creates contradictory documentation — and violations that compound across your fleet.
Complete Coverage Across All Three Standards
PowerCompliance maps directly to the requirements of each standard — no manual interpretation required, no compliance gaps.
Disturbance Monitoring
Automated capture and management of disturbance monitoring equipment data across your IBR fleet.
What Integ Automates
- Automated collection of Sequence of Events (SER) data including breaker status and fault codes
- Fault Recording (FR) capture at main transformers and collector feeders
- Dynamic Disturbance Recording (DDR) for voltage, current, real power, and frequency
- UTC time synchronization validation across all monitored assets
- Phased compliance milestone tracking through 2028 and 2030 deadlines
Ride-Through Performance
Verification and reporting that IBR assets remain connected through defined voltage and frequency disturbances.
What Integ Automates
- Continuous monitoring of IBR ride-through behavior against NERC-defined voltage and frequency envelopes
- Automated performance verification and deviation flagging
- Evidence package generation for each disturbance event
- Asset-level reporting across distributed solar, wind, and storage fleets
- Direct integration with historian and SCADA systems for data extraction
Performance Analysis & Mitigation
Real-time detection, analysis, and mitigation tracking for unexpected real power output changes.
What Integ Automates
- Sub-4-second detection of unexpected real power changes ≥20 MW or ≥10% gross nameplate
- Root cause analysis workflows triggered automatically on detection
- Mitigation plan tracking and evidence documentation
- Fleet-wide performance trend reporting for NERC submissions
- Closed-loop validation that mitigation activities are completed on schedule
Built for Every IBR Asset Type
PowerCompliance handles PRC-028, PRC-029, and PRC-030 requirements across your full inverter-based resource portfolio.
The Numbers Behind Automated IBR Compliance
PowerCompliance eliminates the manual burden of PRC compliance at scale — from data ingestion through audit-ready reporting.
85%
Reduction in evidence collection time
Automated data extraction from historians, SCADA, and inverter systems eliminates weeks of manual coordination per audit cycle.
<4sec
Real power change detection
PowerCompliance meets PRC-030's 4-second detection mandate — automatically flagging deviations and triggering analysis workflows.
100%
Guarantee Deadline Compliance
PowerCompliance transforms compliance from reactive crisis management to proactive integration. Predictive analytics identify deadline risks weeks in advance.
200+
Operational data sources supported
Direct connectors to PI Historians, DCS, SCADA, ISO feeds, and vendor systems — no custom integration required for most deployments.
Get a Demo


From Raw Disturbance Data to Audit-Ready Evidence in Minutes
Get from raw data to actionable insights in four steps. No dataengineering required.
Connect Your IBR Data Sources
PowerCompliance integrates directly with your existing historian systems, SCADA platforms, inverter data feeds, and ISO connections. No manual exports, no IT-heavy setup — most connections go live in days.

Automated Data Capture & Validation
The platform continuously captures SER, fault recording, DDR, and real power performance data in line with PRC-028, PRC-029, and PRC-030 requirements. UTC time synchronization is validated automatically. Deviations and threshold breaches are flagged in real time.
Triggered Analysis & Mitigation Workflows
When a disturbance or performance deviation is detected, PowerCompliance routes analysis tasks to the right personnel, tracks mitigation actions to completion, and maintains a full evidence trail — automatically.
Continuous Audit Readiness
Every data point, workflow completion, and mitigation action is cross-referenced and stored in a living audit package. When NERC auditors request documentation, your evidence is already organized — not assembled in a scramble.
25+ Years Running NERC Compliance for Power Generation
We don't just automate compliance workflows — we built the platform that the largest utilities in the country depend on for every NERC submission cycle. PRC-028, PRC-029, and PRC-030 are new standards on a platform that's been handling NERC complexity for over two decades.

PRC-030 Hits in October 2026. Get Ahead of It Now.
See how PowerCompliance handles PRC-028, PRC-029, and PRC-030 requirements for your IBR fleet — end-to-end, without manual processes.

