Contact information

Get in touch

Contact us today, and let’s work together to find solutions.

Invalid name
Invalid last name
Invalid email address
Incorrect email address
Submit

Thank you!

We will contact you shortly to provide further assistance and answer any questions you may have.

Oops! Something went wrong while submitting the form.
NERC IBR Compliance Automation

PRC-028, PRC-029 & PRC-030 Automated End-to-End

Integ's PowerCompliance handles every data collection, reporting, and  performance analysis requirement across all three NERC IBR standards —  so your team stays compliant without building a new manual process.

/
The Challenge

Three New Standards.
One Narrow Compliance Window.

PRC-028, PRC-029, and PRC-030 impose strict new data capture,  ride-through verification, and performance analysis requirements on  every IBR asset you own. Meeting them manually — across distributed  solar, wind, and storage fleets — is not a sustainable path.

High-volume disturbance data

PRC-028 requires synchronized SER, fault recording, and dynamic  disturbance data from every IBR site — time-stamped to UTC and ready for NERC review.

Real-time performance thresholds

PRC-030 mandates detection of unexpected real power changes ≥20 MW  within 4 seconds. Missing an event isn't a data gap — it's a potential  violation.

Overlapping, phased deadlines

Each standard carries its own compliance timeline. PRC-028 partial  compliance was due April 2025. PRC-030 full compliance hits October  2026. Manual tracking invites missed milestones.

Cross-standard audit exposure

NERC auditors validate consistency across standards. Siloed evidence  management creates contradictory documentation — and violations that  compound across your fleet.

/
Standard-by-Standard Coverage

Complete Coverage Across All Three Standards

PowerCompliance maps directly to the requirements of each standard — no manual interpretation required, no compliance gaps.

PRC-028-1

Disturbance Monitoring

Automated capture and management of disturbance monitoring equipment data across your IBR fleet.

What Integ Automates

  • Automated collection of Sequence of Events (SER) data including breaker status and fault codes
  • Fault Recording (FR) capture at main transformers and collector feeders
  • Dynamic Disturbance Recording (DDR) for voltage, current, real power, and frequency
  • UTC time synchronization validation across all monitored assets
  • Phased compliance milestone tracking through 2028 and 2030 deadlines
Effective April 1, 2025
PRC-029-1

Ride-Through Performance

Verification and reporting that IBR assets remain connected through defined voltage and frequency disturbances.

What Integ Automates

  • Continuous monitoring of IBR ride-through behavior against NERC-defined voltage and frequency envelopes
  • Automated performance verification and deviation flagging
  • Evidence package generation for each disturbance event
  • Asset-level reporting across distributed solar, wind, and storage fleets
  • Direct integration with historian and SCADA systems for data extraction
Currently in effect
PRC-030-1

Performance Analysis & Mitigation

Real-time detection, analysis, and mitigation tracking for unexpected real power output changes.

What Integ Automates

  • Sub-4-second detection of unexpected real power changes ≥20 MW or ≥10% gross nameplate
  • Root cause analysis workflows triggered automatically on detection
  • Mitigation plan tracking and evidence documentation
  • Fleet-wide performance trend reporting for NERC submissions
  • Closed-loop validation that mitigation activities are completed on schedule
Effective October 1, 2026
/
Asset Coverage

Built for Every IBR Asset Type

PowerCompliance handles PRC-028, PRC-029, and PRC-030 requirements across your full inverter-based resource portfolio.

Solar (Utility Scale)
Wind Generation
Battery Storage (BESS)
Hybrid IBR Assets
/
Platform Capabilities

The Numbers Behind Automated IBR Compliance

PowerCompliance eliminates the manual burden of PRC compliance at scale — from data ingestion through audit-ready reporting.

85%

Reduction in evidence collection time

Automated data extraction from historians, SCADA, and inverter systems eliminates weeks of manual coordination per audit cycle.

<4sec

Real power change detection

PowerCompliance meets PRC-030's 4-second detection mandate —  automatically flagging deviations and triggering analysis workflows.

100%

Guarantee Deadline Compliance

PowerCompliance transforms compliance from reactive crisis management to proactive integration. Predictive analytics identify deadline risks weeks in advance.

200+

Operational data sources supported

Direct connectors to PI Historians, DCS, SCADA, ISO feeds, and vendor  systems — no custom integration required for most deployments.

/
See it in Action
/
How It Works

From Raw Disturbance Data to
Audit-Ready Evidence in Minutes

Get from raw data to actionable insights in four steps. No dataengineering required.

Connect Your IBR Data Sources

PowerCompliance integrates directly with your existing historian  systems, SCADA platforms, inverter data feeds, and ISO connections. No  manual exports, no IT-heavy setup — most connections go live in days.

Automated Data Capture & Validation

The platform continuously captures SER, fault recording, DDR, and real  power performance data in line with PRC-028, PRC-029, and PRC-030  requirements. UTC time synchronization is validated automatically.  Deviations and threshold breaches are flagged in real time.

Triggered Analysis & Mitigation Workflows

When a disturbance or performance deviation is detected, PowerCompliance routes analysis tasks to the right personnel, tracks mitigation actions to completion, and maintains a full evidence trail — automatically.

Continuous Audit Readiness

Every data point, workflow completion, and mitigation action is  cross-referenced and stored in a living audit package. When NERC  auditors request documentation, your evidence is already organized — not assembled in a scramble.

/
Testimonials

PowerGADS has saved our team hundreds of hours per month. Instead of entering the same data 3-4 times across systems and manually checking event date, now our plant supervisors enter the data once.

Cooperative in the Southwest US

Cooperative in the Southwest US

Sr. Business Analyst

The implementation process was seamless, thanks to their well-structured approach and clear communication. The Integ team has demonstrated a deep understanding of NERC requirements and constantly evolving NERC/ISO GADS guidelines.

Pratish Kumar

Pratish Kumar

Director | Operations Reporting | Commercial Analytics

PowerAnalytics has taken our reporting to new levels. We can create and publish reports and solution 3-4 times faster than before. It's been a game changer for our internal IT team.

Southwest IPP

Southwest IPP

Director of Information Services

PowerManager has revolutionized our renewables outage reporting. The automation makes it so outages are automatically detected and reported and our folks just review it. We were able to move two FTE resources to help with improve operations and asset performance

PJM Market Participant

PJM Market Participant

Outage Manager

PowerSuite transformed our NERC 693 compliance software process from a quarterly nightmare into a seamless operation. We now spend our time on reliability improvements instead of hunting for evidence.

Director of Compliance

Director of Compliance

Southeast Regional Utility

The automated evidence collection is a game-changer. Our engineering team can finally focus on what they do best - keeping the lights on - instead of drowning in compliance paperwork.

Chief Operating Officer

Chief Operating Officer

Independent Power Producer

25+ Years Running NERC Compliance for Power Generation

We don't just automate compliance workflows — we built the platform that the largest utilities in the country depend on for every NERC  submission cycle. PRC-028, PRC-029, and PRC-030 are new standards on a  platform that's been handling NERC complexity for over two decades.

25+
Years of Experience
14,000+
Users in operations & compliance
100,000+
MW managed on PowerSuite
/
Demo

PRC-030 Hits in October 2026.
Get Ahead of It Now.

See how PowerCompliance handles PRC-028, PRC-029, and PRC-030  requirements for your IBR fleet — end-to-end, without manual processes.

Schedule a Demo
No commitment required. Demos typically run 30 minutes.